Micro turbines and test rigs for customers in Thailand and China
Micro turbine generators from 7 to 65 kW with test equipment
Project at a glance
| Project type: | Plant |
|---|---|
| Scope of supply: | MTG series micro turbine generators from 7 to 65 kW, generators, inverters, electronics, test rigs |
| Clients: | Industrial and research customers |
| Location: | Thailand and China |
| Deliveries: | 2013 to 2020 |
| Implemented by: | pyropower group |

Turbines, generators and test rigs
Starting point
Industrial and research customers in Thailand and China wanted to use, test and further develop micro gas turbines themselves. For this, they needed turbines, generators and the right test equipment.
Implementation
The group of companies supplied MTG series micro turbine generators from 7 to 65 kW, powerheads, high-performance generators, inverters and electronics for series hybrid applications. In addition, there were test rigs with control, load bank, cooling and fuel system, instrumentation and measurement technology, some as fully equipped test rig units.
Result
All deliveries are in operation at the customers’ sites and are used there for operation, testing and further development.
Series hybrid applications
In a series hybrid, the micro gas turbine drives only a generator. The power charges a storage unit or directly supplies an electric motor. The turbine can thus run at its most favourable operating point, while the storage unit absorbs load changes.
[ Knowledge ]
Test rig for micro gas turbines: load, measurement and performance map
- Load bank: absorbs the electrical power and sets defined load points
- Measured variables: speed, pressures, temperatures, air and fuel mass flow, electrical power
- Compressor map: pressure ratio over mass flow, limited by the surge line
On a test rig, a micro gas turbine is operated under controlled conditions. A load bank absorbs the electrical power generated, so that any load point from idle to full load can be set. Cooling and fuel systems ensure that boundary conditions remain reproducible.
Speed, pressures and temperatures at the compressor, combustion chamber and turbine are measured, as well as air and fuel mass flow and the electrical power delivered. This gives the efficiencies of the individual components and of the entire machine. The temperature at the turbine inlet is often so high that it is not measured directly but calculated from the outlet temperature and an energy balance.
A key result is the compressor map. It shows the pressure ratio over the mass flow for different speeds. Towards small mass flows, the surge line limits operation: there the flow separates, and dangerous pressure oscillations occur. A good operating point keeps a sufficient distance from this limit.
More about development ›
From the blogpyropower and Capstone: the micro gas turbine, conventional and externally firedRead more ›
[ Technology ]
Externally fired micro gas turbine
Clean air instead of gas in the turbine and air bearings without oil: this is how the technology works that we have been developing within our group of companies for years.
[ References ]
Latest projects
Biochar production at an industrial site in Mecklenburg-Western Pomerania
Three Pyro-ClinX 150 plants produce power, heat and biochar from industrial wood residues at an industrial site in Mecklenburg-Western Pomerania.
PyroPark Forst
PyroPark Forst is being developed in Lusatia as an integrated energy site that converts woody residues into electricity, usable heat, biochar and certified carbon removal.
ClinX Heat Power Generation from a Carbonization Plant in Darmstadt
ClinX Heat uses high-temperature energy from an existing carbonization plant to generate additional electricity on site.