From idea to a running ClinX system.
[ Pre-project phase ]
The pre-project phase clarifies whether a ClinX system suits your site.
Our approach
We support your project with our experience, from the first idea to running operation. You are never left on your own: whatever you want to handle yourself, you handle, and we are at your side for everything else. Our aim is not to sell a plant, but to make sure your project succeeds as a whole.
Project path
Five stations to operation
Initial call, pre-project phase, engineering, construction and operation. The pre-project phase clarifies whether the ClinX system suits your site and when it pays for itself.
You commission only what you need: individual stations or the entire path. The plant itself always comes from pyropower.
When it pays off
Four good reasons for your own plant
High heat demand
You need a lot of heat over the year, for example for drying, processes or a heating network.
Security of supply
Your own energy supply on site that delivers electricity and heat around the clock.
Predictable energy costs
Electricity and heat become predictable and no longer depend on the market alone.
Biochar as additional revenue
Revenue from biochar and CO₂ certificates is included in the economic assessment.
Pre-project phase
What the pre-project phase assesses
Initial situation
Today’s electricity and heat supply, costs, load curves and the suitability of your biomass.
Plant technology
Preliminary design of the process parameters and a recommendation on plant technology including peripherals.
Site plan 1:500
Preliminary layout planning with residue storage, logistics and clearance areas.
Biochar
Forecast of quality and annual volume, including EBC certifiability.
Framework conditions
Initial assessment of the development plan, site restrictions and the likely permitting route.
Funding
Suitable federal and state grant and loan programs, including SME classification.
Economic viability
Savings, revenue from biochar and CO₂ certificates, and the payback period.
Final report
All results in one project overview, presented online or on site.
Result
Three results for the decision
Final report: all results in one project overview, presented online or on site.
Site plan 1:500: preliminary layout planning with residue storage, logistics and clearance areas.
Economic viability: savings, revenue from biochar and CO₂ certificates, and the payback period.
You can use the documents directly, for example in talks with your bank, for funding applications or as the basis for engineering.
Services
Everything around the ClinX system
01 Fuel testing
Lab analysis or trial pyrolysis in our plant. For other residues that are not untreated, testing is part of the pre-project phase.
02 Pre-project phase
Initial situation, preliminary design, site plan 1:500, biochar forecast, framework conditions, funding check and economic viability. Optional: technology comparison for peak load and storage integration on the electricity or heat side.
03 Engineering
Site survey, design, interfaces, mechanical and electrical engineering, standards and CE, up to a basis ready for ordering. Plus modules for fuel, drying, biochar, steam and operation.
04 Funding application and grid registration
We prepare the funding application, register the grid connection and provide technical documents for the permit.
05 Plant and modules
Manufacturing of the core plant, installation, commissioning, performance test and acceptance. Plus, as needed, fuel storage, fuel drying and biochar discharge and bagging.
06 Service and operation management
Maintenance in three service levels with remote monitoring. On request, we take over operation management.
07 Biochar and CO₂ certificates
We market both for you or buy them from you. That way, you can focus on electricity and heat.
08 Engineering consulting
For questions outside these services, our engineers are available in every project phase.
FAQ
Frequently asked questions about project support
01 How does a project start?
With a conversation by phone or Teams. You then receive a quote for the pre-project phase.
02 Do I have to commission all phases from pyropower?
No. You can take on any phase yourself, commission us for individual phases or just source the technology. The plant itself always comes from pyropower.
03 What does the pre-project phase cost?
You receive a fixed-price quote as soon as you have told us your site and residues. If you later order the plant, we credit the cost of the pre-project phase.
04 Do I need my own residues?
No. Your own residues can be used, but they are not a requirement. pyropower can organize the fuel.
05 Does this also apply to the Pyro-Hex 1000 and ClinX Heat?
Yes. The same path applies to the Pyro-Hex 1000 without power generation. For ClinX Heat, which uses waste heat, we start with a conversation with our engineers.