Project support for ClinX systems: from the pre-project phase to operation.

We support your project with our experience, step by step.

You commission only what you need.

Project support for ClinX systems: from the pre-project phase to operation.

We support your project with our experience, step by step.

You commission only what you need.

Project support for ClinX systems: from the pre-project phase to operation.

We support your project with our experience, step by step.

You commission only what you need.

Our approach

We support your project with our experience, from the first idea to running operation. You are never left on your own: whatever you want to handle yourself, you handle, and we are at your side for everything else. Our aim is not to sell a plant, but to make sure your project succeeds as a whole.

Project path

Five stations to operation

Initial call, pre-project phase, engineering, construction and operation. The pre-project phase clarifies whether the ClinX system suits your site and when it pays for itself.

You commission only what you need: individual stations or the entire path. The plant itself always comes from pyropower.

When it pays off

Four good reasons for your own plant

Mitarbeiter mit Schutzhelm arbeitet mit dem Winkelschleifer, Funken sprühen

High heat demand

You need a lot of heat over the year, for example for drying, processes or a heating network.

Security of supply

Your own energy supply on site that delivers electricity and heat around the clock.

Predictable energy costs

Electricity and heat become predictable and no longer depend on the market alone.

Biochar as additional revenue

Revenue from biochar and CO₂ certificates is included in the economic assessment.

Mockup: Tablet mit Bericht der Vorprojektphase

Pre-project phase

What the pre-project phase assesses

Initial situation

Today’s electricity and heat supply, costs, load curves and the suitability of your biomass.

Plant technology

Preliminary design of the process parameters and a recommendation on plant technology including peripherals.

Site plan 1:500

Preliminary layout planning with residue storage, logistics and clearance areas.

Biochar

Forecast of quality and annual volume, including EBC certifiability.

Framework conditions

Initial assessment of the development plan, site restrictions and the likely permitting route.

Funding

Suitable federal and state grant and loan programs, including SME classification.

Economic viability

Savings, revenue from biochar and CO₂ certificates, and the payback period.

Final report

All results in one project overview, presented online or on site.

Mockup of the three pre-project phase results: final report, site plan 1:500 and economic viability on a tablet

Result

Three results for the decision

Final report: all results in one project overview, presented online or on site.

Site plan 1:500: preliminary layout planning with residue storage, logistics and clearance areas.

Economic viability: savings, revenue from biochar and CO₂ certificates, and the payback period.

You can use the documents directly, for example in talks with your bank, for funding applications or as the basis for engineering.

Request a quote

Services

Everything around the ClinX system

ClinX system with the eight services around it

01 Fuel testing

Lab analysis or trial pyrolysis in our plant. For other residues that are not untreated, testing is part of the pre-project phase.

02 Pre-project phase

Initial situation, preliminary design, site plan 1:500, biochar forecast, framework conditions, funding check and economic viability. Optional: technology comparison for peak load and storage integration on the electricity or heat side.

03 Engineering

Site survey, design, interfaces, mechanical and electrical engineering, standards and CE, up to a basis ready for ordering. Plus modules for fuel, drying, biochar, steam and operation.

04 Funding application and grid registration

We prepare the funding application, register the grid connection and provide technical documents for the permit.

05 Plant and modules

Manufacturing of the core plant, installation, commissioning, performance test and acceptance. Plus, as needed, fuel storage, fuel drying and biochar discharge and bagging.

06 Service and operation management

Maintenance in three service levels with remote monitoring. On request, we take over operation management.

07 Biochar and CO₂ certificates

We market both for you or buy them from you. That way, you can focus on electricity and heat.

08 Engineering consulting

For questions outside these services, our engineers are available in every project phase.

FAQ

Frequently asked questions about project support

Team an einer Energieanlage

01 How does a project start?

With a conversation by phone or Teams. You then receive a quote for the pre-project phase.

02 Do I have to commission all phases from pyropower?

No. You can take on any phase yourself, commission us for individual phases or just source the technology. The plant itself always comes from pyropower.

03 What does the pre-project phase cost?

You receive a fixed-price quote as soon as you have told us your site and residues. If you later order the plant, we credit the cost of the pre-project phase.

04 Do I need my own residues?

No. Your own residues can be used, but they are not a requirement. pyropower can organize the fuel.

05 Does this also apply to the Pyro-Hex 1000 and ClinX Heat?

Yes. The same path applies to the Pyro-Hex 1000 without power generation. For ClinX Heat, which uses waste heat, we start with a conversation with our engineers.